The Joint Measurement Record (JMR) is the irrefutable bedrock of contractor billing in India. It is a physical or digital document containing line-item measurements of work done (e.g., cubic meters of concrete, square meters of plastering). It is measured on-site and physically signed jointly by the contractor's representative and the client's Project Manager to confirm everyone agrees on the exact progress.
At the end of the month, the plastering subcontractor wants to bill. Their supervisor walks the site with the PMC (Project Management Consultant). Together with a measuring tape, they record that exactly 450 sq. meters of wall were plastered. Both sign the JMR sheet. The subcontractor attaches this JMR to their RA Bill as undeniable proof of work.
Superwise digitizes the JMR process entirely. Subcontractors input their measured progress into the Superwise field app. The site engineer reviews and digitally approves the progress. This digital JMR is automatically tethered to the generated RA Bill, completely eliminating paper loss, mathematical disputes, and multi-day measurement delays.
Take a demo or signup now to experience an empowering construction project management solution.